Toggle menu

Gosport Borough Local Plan 2038 Supporting Evidence

The Local Plan 2038 is supported by a number of evidence documents and background work.

The draft Gosport Borough Local Plan 2038 is supported by a number of evidence documents and background work. This evidence will be updated at later stages of the process and will take into account relevant comments made as part of the consultation. The currently available documents can be downloaded below:

TopicDocumentPublication Date
Development Strategy: including the Sustainability Appraisal (SA) and Habitats Regulations Assessment (HRA) Screening Assessment Report Sustainability Appraisal: Non-Technical Summary (PDF) [407KB] 2021
Sustainability Appraisal of the Draft Gosport Borough Local Plan 2038 (PDF) [24MB] 2021
Annex A - Detailed Sustainability Appraisal Proforma for the Strategic Policies and General Development Policies (PDF) [7MB] 2021
Annex B - Detailed Sustainability Appraisal Proforma for the Strategic Development Sites and Other Allocation Sites (PDF) [20MB] 2021
Sustainability Appraisal Scoping Report - March 2021 (PDF) [1MB] 2021
Habitats Regulations Assessment (HRA) Screening Assessment Report (August 2021) (PDF) [5MB] 2021
Gosport Borough Local Plan 2038 - Nutrient Budget (PDF) [304KB] 2021
Appendix 1 - Nutrient Budget GBLP 2038 (PDF) [319KB] 2021
Urban Area Boundary Background Paper (PDF) [688KB] 2021
Key DataGosport ProfileOngoing
Climate ChangeGosport Climate Change Strategy 2020-20232020
Gosport Climate Change Action PlanOngoing
Sustainable Development and Climate Change Background Paper (PDF) [711KB] 2021
Economy and Employment Economic Development Needs Assessment and Economic Land Availability Assessment (BE Group for GBC) (PDF) [5MB] 2021
Employment Background Paper (PDF) [1MB] 2021
Gosport Economic Development Strategy 2021-2031 (PDF) [10MB] 2021
Economic Development Strategy Evidence Base (PDF) [1MB] 2020
PfSH Economic, Employment and Commercial Needs (including logistics) Study2021
Housing and Demographics Strategic Housing Land Availability Assessment (SHLAA) 2021 (PDF) [13MB] 2021
SHLAA Assessment Summary Appendix (PDF) [1MB] 2021
SHLAA Proforma (split by ward)2021
Housing Background Paper (PDF) [1MB] 2021
Hampshire Consortium Gypsy, Traveller and Travelling Showpeople Accommodation Assessment Summary 2016-2036 (PDF) [2MB] 2017
Gypsies and Travellers and Travelling Showpeople Background Paper (PDF) [608KB] 2021
Demographic Projections (JG Consulting for GBC) (PDF) [915KB] 2021
Infrastructure Infrastructure Assessment Report (IAR) 2021 (PDF) [1MB] 2021
Infrastructure Funding Statement (IFS) and Infrastructure Delivery Plan (IDP)Ongoing
Gosport Infrastructure Investment Plan (GIIP) (Solent LEP) (PDF) [4MB] 2019
Transport Gosport Borough Local Plan SRTM Modelling Report (SYSTRA)  (PDF) [23MB] 2021
Interim Transport Background Paper Consideration of Initial Transport Modelling (PDF) [578KB] 2021
GBC Living List of Cycling and Pedestrian Improvements Nov 2021 (PDF) [329KB] 2021
Gosport Local Cycling and Walking Infrastructure Plan LCWIP2022
Flood Risk and Coastal Erosion PfSH Level 1 Strategic Flood Risk Assessment - Part 1 Main Report 2024 (PDF) [856KB] 2024
PfSH Level 1 Strategic Flood Risk Assessment - Part 6 Gosport Borough Council 2023 (PDF) [870KB] 2023
PfSH Level 1 Strategic Flood Risk Assessment 2023/2024 - Appendix A and Appendix B2023
PfSH Level 2 Strategic Flood Risk Assessment - Gosport Borough Council 2023 (PDF) [11MB] 2023
PfSH Level 2 Strategic Flood Risk Assessment 2023 - Appendix A2023
Haslar Peninsular H++ 2122 Scenario 5% max Depth (PDF) [1MB] 2023
Haslar Peninsular H++ 2122 Scenario 5% max Hazard (PDF) [3MB] 2023
Interim Strategic Flood Risk Assessment (iSFRA) of the Gosport Borough Local Plan 2038 (PDF) [4MB] 2021
Appendix 1- smaller allocations in Flood Zone 1 surface water flooding (PDF) [5MB] 2021
Flood Risk and Coastal Change Background Paper (PDF) [630KB] 2021
PfSH Strategic Flood Risk Assessment (PDF) [1MB] 2016
PfSH Strategic Flood Risk Assessment - 2016 Update Guidance Document: Gosport Borough Council (PDF) [162KB] 2016
PfSH SFRA Mapping2016
River Hamble to Portchester Coastal Flood and Erosion Risk Management Strategy (PDF) [23MB] 2014
Local Environment: including Nature Conservation, Biodiversity, Green Infrastructure and Open Space Open Space Monitoring Report 2021 (PDF) [18MB] 2021
GBC Playing Pitch Strategy - Stage D and Appendices Final Report April 2024 (PDF) [1MB] 2024
Gosport Built Facility Study - Final Report November 2021 (PDF) [4MB] 2021
Local Open Space Standards (PDF) [1MB] 2021
Draft Allotment Strategy 2021 (PDF) [7MB] 2021
Solent Waders and Brent Goose Strategy (SWBGS)2020
Solent Recreation Mitigation Strategy (Bird Aware Solent)2017
PfSH Integrated Water Management Study (PDF) [1MB] 2018
PfSH Air Quality Impact Assessment (appendices available upon request) (PDF) [6MB]  2018
Biodiversity and Geological Conservation Background Paper (PDF) [653KB] 2021
Design and Historic Environent Design and Built Heritage Background Paper (PDF) [1MB] 2021
Gosport Townscape Assessment (PDF) [17MB] 2013
Design Guidance Supplementary Planning Document2014
Marine Parade Area of Special Character Supplementary Planning Document2007
Lee West Area of Special Character Supplementary Planning Document2019
Parking Supplementary Planning Document2014
Conservation Area Appraisals in Gosport BoroughVarious
Retail, Leisure and Tourism Gosport Retail, Leisure and Tourism Study (LSH on behalf of GBC) (PDF) [12MB] 2021
Gosport Retail, Leisure and Tourism Study Supporting Appendices2021
Health Hot Food Takeaway Background Paper (PDF) [1MB] 2021
Site SpecificGosport Waterfront and Town Centre Supplementary Planning Document2018
Daedalus Supplementary Planning Document2011
Sub-regional PlanningPfSH Spatial Position Statement2016
OtherLocal Development Scheme (LDS)2021
Statement of Community Involvement (SCI)2019
Authority Monitoring Report (AMR)Ongoing

 

Share this page

Share on Facebook Share on Twitter Share by email